Land Transport New Zealand Annual Report

for the year ending 30 June 2006

Statement of service performance

Land Transport NZ's output classes fall into two distinct categories:

  • Those delivered directly by Land Transport NZ (or contracted agents).
  • Those delivered by approved organisations (with Land Transport NZ funding support).

The performance measures contained in this report have been assembled from those for the two pre-existing organisations, Transfund NZ and the Land Transport Safety Authority, with some revision. Land Transport NZ has been working with the Ministry of Transport over 2005/06 to further review and refine the set of performance measures.

Where necessary, comparative figures with the previous year have been adjusted to correspond to changes in output classes, and presentation and classifications adopted in the financial statements during this current year.

A large number of measures this year are new, as a result of the introduction of new output classes as agreed with Treasury.

Output class | Research and performance monitoring

Description

This output class is delivered directly by Land Transport NZ (or contracted agents) and involves:

  • organising and publishing research
  • coordinating and reporting performance monitoring of the land transport system.

Output objectives

Improved formulation and delivery of strategies and programmes through effective and efficient:

  • organisation and publication of research
  • monitoring of land transport inputs, outputs, impacts and consequences.

Key performance measures

Performance measure
Actual 7 months
Estimate
Actual
Quantity
2004/05
2005/06
2005/06
Publication of research findings in Land Transport Research
(previously Transearch)
1 issue
4 issues
4
Publication of performance information
New
1 issue
1
Percentage funding allocation (by theme):
New
   
Asset management  
30-40%
37%
Natural hazard risk management  
1-5%
2%
Safety and personal security  
5-15%
16%
Environmental effects  
15-20%
17%
Travel behaviour change  
10-25%
14%
Traffic management  
5-15%
5%
Sustainable land transport  
10-25%
9%
Performance measure
Actual 7 months
Target
Actual
Quality
2004/05
2005/06
2005/06
% of approved organisations and relevant transport industry representatives that agree that Land Transport NZ's research programme adds value to the land transport industry
New
≥80%
81%
% of research projects completed on time
70%
≥75%
49%1
% of approved organisations and relevant transport industry representatives that agree that performance monitoring adds value to the land transport industry
New
≥80%
72%
% of approved organisations and land transport industry representatives that agree that Land Transport NZ's industry training adds value to the land transport industry
81%
≥80%
72%

Notes
1 A number of research projects had a target completion date of 30 June. Researchers have sought time extensions during the course of undertaking the research. These extensions have been approved with the resulting outcome in the performance measure that measures against the original completion date.

 
Actual
Budget
Actual
 
7 months
12 months
12 months
 
2004/05
2005/06
2005/06
Research and performance monitoring
$000
$000
$000
NLTP funding from NLTF
2,707
4,953
4,953
Total revenue
2,707
4,953
4,953
Expenditure
2,707
4,953
5,563
Output class net surplus (deficit)
0
0
(610)

Output class | Promotion, information and education activities

Description
Under this output class, Land Transport NZ (or contracted agents) delivers transport safety information and promotion under the following outputs:

  • Land transport sustainability.
  • Safe land transport.
  • Information and advice to government and stakeholders on issues relating to Land Transport NZ functions.
  • Road Safety Trust.

Output objectives
Progress towards a safer, more sustainable land transport system through effective and efficient:

  • promotion of land transport sustainability
  • promotion of safe land transport
  • provision of information and advice.
Performance measure
Actual 7 months
Estimate
Actual
Quantity
2004/05
2005/06
2005/06
Number of contracts for delivery of the Community Road Safety Programme (CRSP)
37
150-180
181
Number of schools participating in the Road Safety Education Programme
1,115
1,000
1,257
Number of issues of Land Transport News
6
11
11
Number of road codes reviewed and updated
3
3
3
Number of manuals and standards issued
5
4
9
Road safety data and issues reports
0
74
74
General land transport publications
66
40
44
National Community Road Safety Conference or Symposium
NA
1
1
Number of Australasian New Car Assessment Programme (ANCAP) advertising initiatives completed
1
1
1
Number of road safety advertising campaigns for Maori and Pacific peoples
2
2
2
Road Safety advertising package      
> number of themed flights (flights)
11.5
18
22
> average number of targeted audience rating points (TARPs) purchased1
757
666
895
% of media spend on television
64%
65%-75%
67%

Notes
1 This a monthly target. The monthly average was higher than the Statement of Intent target of 666 per month. The purchasing arrangements for 2005/06 enabled significantly more TARPS to be achieved within the available budget.

Performance measure
Actual 7 months
Target
Actual
Quality
2004/05
2005/06
2005/06
% of Community Road Safety Programme providers who rate Land Transport NZ assistance and advice as very good or better based on independent surveys against agreed criteria
82%
≥75%
73%
% of survey respondents who rate publications as useful or better
81%
≥75%
80%
Total unprompted recall by the target audience of road safety television commercials, tested quarterly and averaged over 12 months
73%
≥70%
77%
Relevance of road safety television commercials to the target audience, tested quarterly and averaged over 12 months
56%
≥60%
63%

 
Actual
Budget
Actual
 
7 months
12 months
12 months
 
2004/05
2005/06
2005/06
Promotion, information and education activities
$000
$000
$000
Safety administration programme (SAP)
13,506
28,675
28,675
Third party revenue
2,546
2,871
4,011
Total revenue
16,052
31,546
32,686
Expenditure
21,846
31,601
32,976
Output class net surplus (deficit)
(5,794)
(55)
(290)

Output class | Regulatory implementation and enforcement

Description
This output class is directly delivered by Land Transport NZ (or contracted agents) to:

  • develop rules
  • provide regulatory services including enforcement in relation to vehicle certification, vehicle inspection and certifying organisations, driver licence administration, driver testing, driver licence course provision, border check processes, licensed transport service operations and transport operator vehicle fleet audits.

Output objectives
Progress towards a safer, more sustainable land transport system with reduced adverse impacts on the environment and public health, through effective and efficient:

  • rules development
  • delivery of regulatory services and enforcement.
Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
Number of rules signed
New
5
15 (2 + 13 from
Omnibus Rule)1
Number of rules underway
New
0
4
Number of rules to be started
New
7
3
Reviews of vehicle inspectors and inspecting organisations
1,622
1,800-2,200
2,307
Audits of driver licence administration
New
30
30
Audits of driver testing officers
21
30
25
Audits of driver licence course providers
113
140-160
154
Audits of licensed transport service operations
77
100-120
112
Audits of transport operator vehicle fleets
30
40-50
75
Random roadside audits of transport service vehicles
50
20-40
24
Reports on audits of border check agencies
4
4
4
Complaints investigated
246
200
310
Joint crash investigations
19
15-21
23
Road controlling authorities surveyed on 1-2 topics
30
30
32
Monitoring of rail operator's annual audits
53
65-85
76
Special focus rail audits
1
0-4
1
Number of Transport Accident Investigation Commission
rail safety recommendations
New
0-2
0
% Transport Accident Investigation Commission
recommendations actioned and reported
New
100%
100%
New safety management systems adopted by road
controlling authorities
16
5
5
Safety management system implementation trials undertaken
13
20
10
Draft responses to ministerial correspondence
182
300-400
345
Draft responses to parliamentary questions
49
90-120
67
Direct responses to ministerial correspondence
20
200-400
82

Notes

1 The draft Omnibus Rule was separated into 13 Amendment Rules (this had been counted as one in the target estimates).

2 Far fewer requests requiring direct responses to ministerial correspondence were received in 2005/06 than was estimated in the Statement of Intent targets.

Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
% of safety-critical non-compliances rectified to the satisfaction of the Chief Executive within 30 days
New
100%
95%
% of driver tests that comply with the Land Transport NZ Driver testing officers manual (as determined by audit)
99%
95%
100%
% draft responses to Ministerial correspondence and parliamentary questions accepted by the Minister
98%
≥95%
96%
% Ministerial correspondence responded to within 12 working days
100%
100%
71%
% parliamentary questions delivered within agreed timeframes
100%
100%
100%
Regulatory implementation and enforcement
Actual
7 months
2004/05
$000
Budget
12 months
2005/06
$000
Actual
12 months
2005/06
$000
Crown
320
548
548
Safety administration programme (SAP)
995
1,335
1,335
Contract services
591
1,013
1,013
Third party revenue
10,477
15,503
19,476
Total revenue
12,383
18,399
22,372
Expenditure
13,757
19,636
20,439
Output class net surplus (deficit)
(1,374)
(1,237)
1,933

Output class | Licensing activities

Description
This output class is delivered directly by Land Transport NZ (using Crown and third party funding) to:

  • provide driver licensing and testing services for the land transport sector
  • pay fees to storage providers for unclaimed vehicles impounded by the NZ Police
  • pay drug and alcohol assessment fees.

Output objectives
Progress towards a safer, more secure land transport system through effective and efficient delivery of licensing activities.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
Driver licences issued (new, renewals, endorsements, overseas conversions and conversions/upgrades)
395,305
700,000
565,000
Transport services licences issued
2,016
2,500-3,500
3,721
Overdimension permits issued
4,219
7,500-8,000
7,277
Theory, practical and older driver tests
219,931
410,000
375,000
Number of vehicle impoundment payments
1,480
4,800-5,000
2,735
Number of drug and alcohol assessments
514
1,400
967
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
Appeals on points of law or procedural matters sustained regarding the Chief Executive's decisions
Nil
Nil
Nil
% of licences issued within specified timeframes
100%
100%
100%
% of ordinary and special over dimension permits issued within specified timeframes
100%
≥98%
100%
% of driver tests delivered within timeliness guidelines
95%
≥95%
96.9%

Licensing activities
Actual
7 months
2004/05
$000
Budget
12 months
2005/06
$000
Actual
12 months
2005/06
$000
Crown
965
1,655
1,655
Safety administration programme (SAP)
393
444
444
Third party revenue
25,317
45,910
42,771
Total revenue
26,675
48,009
44,870
Expenditure
26,156
47,939
43,268
Output class net surplus (deficit)
519
70
1,602

Output class | Management of the funding allocation system

Description
This output class is delivered directly by Land Transport NZ (or contracted agents) to:

  • manage the National Land Transport Account, including the development and administration of:
    • the National Land Transport Programme (NLTP) funded from the National Land Transport Fund
    • procurement procedures, policies and guidelines
    • performance agreements with approved organisations, as service providers, to record the arrangements between the parties for the implementation of the NLTP
  • audit approved organisations in relation to activities approved by Land Transport NZ, and the operation of the organisation's land transport disbursement account
  • assist and advise approved organisations with their contribution towards an affordable, integrated, safe, responsive and sustainable land transport system.

Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through effective and efficient management of the funding allocation system.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
Number of approved organisations audited
New
29
40
Number of activities subject to post-implementation audits
New
9
12
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
Generally applied funding priority threshold (seriousness and urgency of the problem, effectiveness of the solution, efficiency of the solution)
New
Medium
Medium High
Medium High
% of all activities that delivered the forecast benefits (as determined by post-implementation reviews/audits)
New
100%
83%1
% of all activities delivered at forecast cost (as determined by post-implementation reviews/audits)
New
100%
75%2
% of relevant stakeholders who rate the way in which Land Transport NZ assists and advises stakeholders to formulate proposed activities and procurement procedures as 'very good' or better based on independent surveys against agreed criteria
New
>75%
59%3
% of relevant stakeholders who rate the way in which Land Transport NZ processes and administers funding applications and procurement procedures as 'very good' or better based on independent surveys against agreed criteria
New
>75%
60%3
% of relevant stakeholders who rate the way in which Land Transport NZ undertakes its auditing activities as 'very good' or better based on independent surveys against agreed criteria
New
>75%
78%3

Notes
1 Two out of 12 projects had high negative safety benefits from turning movements at intersections.
2 Three projects out of 12 cost more than the forecast cost. Two projects were well under.
3 The Statement of Intent targets were set with the understanding that 'very good' was the second to best rating. However, in the survey 'very good' was the top rating. To keep the scores for these measures relevant and meaningful, they have been reported against 'good or better'.

Performance measure continued
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality continued      
% of issues raised in audits of approved organisations that are resolved within agreed time-frames
100%
100%
66%4
Publication of the NLTP for the following financial year no later than 30 June
Yes
Yes
Yes
% of agreements with approved organisations that are in place by 31 July
New
100%
72%
Efficiency of new works in the NLTP as measured by benefit/cost ratio (average for applicable approved activities)
New
>2
3.6
Land Transport NZ costs for management of the funding allocation system as a % of the total cost of the National Land Transport Programme
New
<1%
0.8%

Management of the funding allocation system
Actual
7 months
2004/05
$000
Budget
12 months
2005/06
$000
Actual
12 months
2005/06
$000
NLTP funding from NLTF
5,198
13,287
13,287
Total revenue
5,198
13,287
13,287
Expenditure
5,198
13,287
12,078
Output class net surplus (deficit)
0
0
1,209

Notes
4 Recommendations not taken up relate to the Road Assessment Maintenance and Management system (RAMM) and technical reviews which can take longer than 12 months to resolve.

Output class | Motor vehicle registry and revenue management

Description
Under this output class, Land Transport NZ is contracted to provide the following services under an agreement with the Secretary for Transport:

  • Provide an administrative and accounting service for the collection and refund of motor vehicle registration and licensing fees and ACC levies; road user distance/weight and time licences; and fuel excise duty credited to the National Land Transport Fund.

Output objectives
Improved planning, maintenance, management and development of the land transport system through effective and efficient management of the motor vehicle registry and revenue collection.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
Collection and refund of revenue
> Motor vehicle new registration
> Motor vehicle licences
> Motor vehicle change of ownership
> Other licensing transactions
> Road user charge licences
> Road user charge refunds
> Fuel excise duty refunds

190,112
2,950,297
573,171
396,172
1,170,841
172,999
11,752

340,000
5,300,000
1,050,000
870,000
2,000,000
290,000
14,000

327,000
5,080,000
1,002,000
1,290,000
1,962,000
310,000
25,000
Motor vehicle information
> Number of motor vehicle information requests

4.4m

10.0m

10.9m
Evasion detection and enforcement
> Number of road user charge investigations
> Number of road user charge audits
> Number of road user charge surveys
> Number of light vehicle audits

76
1,523
26
8,713

90-110
3,000-4,500
60-80
10,000-12,000

109
2,806
82
15,161
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
Collection and refund of revenue      
> Unplanned outage of LANDATA1 computer system
0.36hrs
<48hrs
3.5hrs
> Accuracy of LANDATA computer system records (by random sample)
98%
≥95%
97.9%
> % of motor vehicle registry and road user charge licence customers who rate the services provided as 'good' or better based on independent survey
97%
≥90%
96%
> Road user charge and motor vehicle registry total costs per transaction
$5.86
$6.11
$5.83
Motor vehicle information      
> % of users who rank motor vehicle registry supplied data as meeting their expectations, based on independent survey
83%
≥90%
86%
Evasion detection and enforcement      
> Amount of identified and proven road user charge revenue evasion
$7.3m
$8-10m
$12.78m
> Amount of revenue recovered from road user charge evasion
New
0
NA2
> Amount of revenue from road user charge and motor vehicle registry evasion written off as bad debt
New
0
NA2

Motor vehicle registry and revenue management
Actual
7 months
2004/05
$000
Budget
12 months
2005/06
$000
Actual
12 months
2005/06
$000
Contract services
23,677
48,886
45,886
Third party revenue
6,866
12,267
12,135
Total revenue
30,543
61,153
58,021
Expenditure
32,323
60,852
56,535
Output class net surplus (deficit)
(1,780)
301
1,486

Notes
1 LANDATA is the register for motor vehicles, road user charges and the vehicle inspection system.
2 New measures put in place for 2005/06 but the process was not put in place to measure the performance of set targets. The process has been put in place for 2006/07 year.

Output class | Rail and sea freight

Description
Under this output class, Land Transport NZ co-funds, with approved organisations, initiatives that encourage the movement of freight by rail and coastal shipping (including barging) instead of by road.

Output objectives
Progress towards a safer, more integrated and sustainable land transport system though effective and efficient use of alternatives to road freight.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
Freight diverted from road to rail (million tonne-km)
New
22.0
Nil1
Freight diverted from road to coastal shipping (million tonne-km)
New
8.4
5.6
Number of currently funded activities
New
5
6

Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
% of allocated funds actually spent
New
100%
18%2
Forecast efficiency ratio (average for approved new activities)
New
>1
Nil
% of activities that delivered the forecast benefits (as determined by post-implementation reviews/audits)
New
100%
NA3
Total cost ($000)
New
2,065
371

Notes
1 No new funding applications were received.
2 Regions are still developing their priorities for funding, hence there have been very few projects developed sufficiently to enable funding applications to be made.
3 No activities reviewed this year.

Output class | Transport demand management, walking and cycling

Description
Under this output class, Land Transport NZ co-funds, with approved organisations:

  • initiatives to improve the management and use of land transport networks
  • travel behaviour change initiatives
  • new and improved walking and cycling infrastructure.

Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through effective and efficient activities that:

  • improve the management and use of land transport networks
  • reduce dependence on private motor vehicles
  • develop new and improved walking and cycling infrastructure.
Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
Number of school travel plans funded
New
100
551
Number of workplace travel plans funded
New
40
411
Length of walkway/cycleway funded (km)
New
100
36.71

Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
% of allocated funds actually spent
New
100%
47%2
Forecast benefit/cost ratio (average for approved new activities)
New
>1
2.1
% of activities that delivered the forecast benefits (as determined by post-implementation reviews/audits)
New
100%
NA3
Total cost ($000)
New
17,607
8,216

Notes
1 The target was new for 2005/06 and was set in the absence of historical information and detailed information from approved organisations on their funding applications.
2 Regions are still developing their priorities for funding, hence few projects have been sufficiently developed to enable funding applications to be made.
3 No activities reviewed this year.

Output class | Passenger transport

Description
Under this output class, Land Transport NZ co-funds non-commercial road, rail and ferry infrastructure and services delivered by approved organisations.

Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through effective and efficient activities that increase access to and use of passenger transport services.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
Total boardings on buses (million)
No return
92.0
89.91
Total boardings on ferries (million)
No return
4.0
4.2
Total boardings on rail (million)
No return
15.0
16.32
Total mobility boardings (million)
No return
1.9
1.9
Total passenger-km on buses (million)
New
650.0
620.5
Total passenger-km on ferries (million)
New
39.0
47.7
Total passenger-km on rail (million)
New
330.0
352.0
Length of dedicated bus-lane funded (km)
New
4.0
16.03
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
User satisfaction, as measured by the % of users who rate passenger transport services as 'good' or better by an annual independent survey
No return
≥75%
88%2
User satisfaction, as measured by the % of users who rate total mobility services as 'good' or better by an annual independent survey
No return
≥75%
90%
Land Transport NZ subsidy per passenger boarding on buses
New
$0.90
$1.05
Land Transport NZ subsidy per passenger boarding on ferries
New
$0.39
$1.554
Land Transport NZ subsidy per passenger boarding on rail
New
$2.73
$2.02
Land Transport NZ subsidy per passenger-km
No return
$0.12
$0.135
% of total costs recovered by fares on non-commercial services
No return
 
45.7%6
Forecast benefit / cost ratio (average for approved new activities)
New
>1
1.4
% of activities that delivered the forecast benefits (as determined by post-implementation reviews/audits)
New
100%
NA7
Total cost ($000)
65,069
181,581
211,789

Notes
1 Boardings were 5% higher (4.2 million) than 2004/05. Bus patronage was lower than target, primarily due to lower growth rates than originally predicted.

2 Actual rail patronage was 14.7% higher than 2004/05 and higher than target due to growth in passenger rail in Auckland.

3 Predominantly Northern busway.

4 New performance measure, the initial target took account of commercial as well as contracted passenger boardings. A revision will be required for 2006/07.

5 The higher subsidy per total passenger kilometre is primarily due to cost escalation of service provision outweighing the increase in overall passenger kilometres.

6 The lower farebox recovery reflects a greater contribution of the additional costs being met by subsidy payments. Regional fare increases in 2006/07 should go some way to keep this from dropping further.

7 No activities reviewed this year.

Output class | Regional land transport

Description
Under this output class, Land Transport NZ funds regional priority land transport activities and the improvement of roads for the regional development of Northland and Tairawhiti. These outputs are delivered by approved organisations (with Land Transport NZ funding support).

Regionally distributed land transport funds

Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system in each region by contributing effectively and efficiently towards:

  • promotion, information and education
  • new and improved land transport infrastructure and services
  • transport demand management.
Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
% of funds allocated to output classes:
New
   
> Transport demand management, walking and cycling  
10%
4%
> Passenger transport services  
26%
40%
> New and improved state highways  
48%
Nil1
> New and improved local roads  
16%
56%
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
% of allocated funds actually spent
New
100%
9%2
Note: Specifics of performance reported within other output classes      
Total cost ($000)
17,529
65,563
6,104

Notes
1 No funding requests received for state highways.
2 Most regions are still developing their priorities for funding, hence very few projects were sufficiently developed to enable funding applications to be made.

Regional development - Northland and Tairawhiti

Output objectives
Progress towards a more responsive land transport system by assisting regional economic development through effective and efficient improvements to land transport infrastructure.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
% of funds allocated to:
New
   
> new and improved state highways  
0%
Nil
> new and improved local roads  
100%
100%
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
% of allocated funds actually spent ($15m allocated)
New
100%
101%2
Note: Specifics of performance reported within other output classes      

Output class | Auckland land transport

Description
Under this output class, the Minister of Transport purchases activities that support the increased integration of transport and land use in the Auckland region, using Crown funding. This output is delivered by approved organisations (with Land Transport NZ funding support).

Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system in Auckland, through effective and efficient activities, with priority given to:

  • improvements to passenger transport services and infrastructure
  • transport demand management
  • improvements to strategic roading.
Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
% of funds allocated to output classes:
New
   
> Passenger transport services  
100%
100%
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
% of allocated funds actually spent
New
100%
8%1
Note: Specifics of performance reported within other output classes      
Total cost ($000)
New
64,000
4,947

Notes
1 The Auckland region is still developing their priorities for funding. Therefore, very few projects have been sufficiently developed to enable funding applications to be made.

Output class | Wellington land transport

Description
Under this output class, the Minister of Transport purchases activities that retain passenger transport mode share, address congestion and improve access to the Wellington region, using Crown funding. This output class is delivered by approved organisations (with Land Transport NZ funding support).

Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system in Wellington, though effective and efficient activities, with priority given to:

  • enhancing passenger transport services and infrastructure and retaining passenger transport mode share
  • transport demand management
  • walking and cycling
  • strategic roading.
Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
% of funds allocated to output classes:
New
   
> Transport demand management, walking and cycling  
13
100%1
> Passenger transport services  
42
Nil
> New and improved state highways  
30
Nil
> New and improved local roads  
15
Nil
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
% of allocated funds actually spent
New
100%
7%2
Note: Specifics of performance reported within other output classes      
Total cost ($000)
New
1,250
93

Notes
1 No funding applications were received for passenger transport services, new and improved state highways or new and improved local roads. 100% of funds allocated were to transport demand management, walking and cycling.
2 The Wellington region is still developing their priorities for funding, hence there have been very few projects sufficiently developed to enable funding applications to be made.

Output class | New and improved infrastructure for state highways

Description
Under this capital appropriation Land Transport NZ purchases state highway capital improvements. This output class is delivered by approved organisations (with Land Transport NZ funding support).

Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through effective and efficient development of new and improved road infrastructure.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
New roads (lane-km)
New
6
3.61
New bridges (lane-m)
New
20
N/A2
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
Cost of new urban roads ($/m2 of new road)
New
 
$2800/m2 to $4000/m2
Cost of new rural roads ($/m2 of new road)
New
 
$200/m2 to $500m2
Forecast benefit/cost ratio (average for approved new activities)
New
≥4
4.0
% of activities that delivered the forecast benefits
(as determined by post-implementation reviews/audits)
New
100%
67%3
Total cost ($000)  
679,559
714,470
Less cost funded by Transit New Zealand property sales  
(15,000)
(12,423)
Total cost funded by NLTP ($000)
293,819
664,559
702,047

Notes
1 Includes new infrastructure for roads.
2 New bridges are no longer separately accounted for. They are now included in new roads.
3 Four out of six projects reviewed delivered the forecast benefits.

Output class | Maintenance of state highways

Description
Under this output class, Land Transport NZ purchases the routine and periodic maintenance of state highways.

Output objectives
Progress towards a safer, more sustainable land transport system through effective and efficient preservation of roading infrastructure.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
Minor safety activities ($000)
New
26,133
21,298
Road reconstruction (lane-km)
New
40
82
Pavement smoothing (lane-km)
New
60
7
Area wide pavement treatment (lane-km)
New
360
170
Reseals (lane-km)
New
2,600
1,185
Bridge reconstruction (lane-m)
New
1,000
2,900
% of roads undergoing periodic maintenance
New
 
13%
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
Ride quality (smooth travel exposure, STE)
New
Steady
Steady
Road condition index (CI)
New
 
Improving1
Road pavement integrity index (PII)
New
 
Improving1
Cost of routine maintenance per network-km
New
 
$19.4
Cost of periodic maintenance per network-km
New
 
$13.6
Total cost  
186,570
227,166
Less cost funded by Transit New Zealand property sales  
(12,100)
(18,131)
Total cost funded by NLTP ($000)
243,155
174,470
209,035

Notes
1 Reflects trend over last five years.

Output class | New and improved infrastructure for local roads

Description
Under this output class, Land Transport NZ co-funds, with approved organisations, local roads capital improvements.

Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through effective and efficient development of new and improved road infrastructure.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
New roads (lane-km)
New
8
1441
Seal extensions (lane-km) New 280 209
New
280
209
New bridges (lane-m)
New
40
4131
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
Cost of new urban roads ($/m2 of new road)
New
 
$40 to $265
Cost of new rural roads ($/m2 of new road)
New
 
$20 to $175
Forecast benefit / cost ratio (average for approved new activities)
New
≥4
4.2
% of activities that delivered the forecast benefits (as determined by post-implementation reviews/audits)
New
100%
100%
Total cost ($000)
84,503
312,410
281,012

Notes
1 Target erroneously based on recent past achievement instead of projects submitted for 2005/06. Actual based on information provided through the Annual Achievement Returns collected from approved organisations.

Output class | Maintenance of local roads

Description
Under this output class, Land Transport NZ co-funds, with approved organisations, the routine and periodic maintenance of local roads infrastructure.

Output objectives
Progress towards a safer, more sustainable land transport system through effective and efficient preservation of roading infrastructure.

Performance measure
Actual 7 months
2004/05
Estimate
2005/06
Actual
2005/06
Quantity      
Minor safety activities ($000)
New
26,708
25,814
Road reconstruction (lane-km)
New
360
282
Pavement smoothing (lane-km)
New
200
282
Area wide pavement treatment (lane-km)
New
900
704
Reseals (lane-km)
New
7,600
5,447
Bridge reconstruction (lane-m)
New
1,400
492
% of roads undergoing periodic maintenance
New
9%
8%
Performance measure
Actual 7 months
2004/05
Target
2005/06
Actual
2005/06
Quality      
Ride quality (smooth travel exposure, STE)
New
Steady
Steady
Road condition index (CI)
New
Improving
Improving1
Road pavement integrity index (PII)
New
Steady
Improving1
Cost of routine maintenance per network-km
New
 
$2.6
Cost of periodic maintenance per network-km New $1.8
New
 
$1.8
Total cost ($000)
239,335
167,715
225,401
 
Actual
7 months
2004/05
Budget
12 months
2005/06
Actual
12 months
2005/06
National Land Transport Programme
$000
$000
$000
Crown
48,301
60,498
61,054
NLTP funding from NLTF
783,739
1,462,827
1,462,114
Third party revenue
7,446
2,000
14,222
Total revenue
839,486
1,525,325
1,537,390
Expenditure
956,055
1,651,220
1,649,015
Output class net surplus (deficit)
(116,569)
(125,895)
(111,625)

Notes
1 Reflects trend over the last five years.

< previous | next >

Page created: 13 February 2007