Land Transport NZ's output classes fall into two distinct categories:
The performance measures contained in this report have been assembled from those for the two pre-existing organisations, Transfund NZ and the Land Transport Safety Authority, with some revision. Land Transport NZ has been working with the Ministry of Transport over 2005/06 to further review and refine the set of performance measures.
Where necessary, comparative figures with the previous year have been adjusted to correspond to changes in output classes, and presentation and classifications adopted in the financial statements during this current year.
A large number of measures this year are new, as a result of the introduction of new output classes as agreed with Treasury.
This output class is delivered directly by Land Transport NZ (or contracted agents) and involves:
Improved formulation and delivery of strategies and programmes through effective and efficient:
| Performance measure | Actual 7 months |
Estimate |
Actual |
|---|---|---|---|
| Quantity | 2004/05 |
2005/06 |
2005/06 |
| Publication of research findings in Land Transport Research (previously Transearch) |
1 issue |
4 issues |
4 |
| Publication of performance information | New |
1 issue |
1 |
| Percentage funding allocation (by theme): | New |
||
| Asset management | 30-40% |
37% |
|
| Natural hazard risk management | 1-5% |
2% |
|
| Safety and personal security | 5-15% |
16% |
|
| Environmental effects | 15-20% |
17% |
|
| Travel behaviour change | 10-25% |
14% |
|
| Traffic management | 5-15% |
5% |
|
| Sustainable land transport | 10-25% |
9% |
|
| Performance measure | Actual 7 months |
Target |
Actual |
| Quality | 2004/05 |
2005/06 |
2005/06 |
| % of approved organisations and relevant transport industry representatives that agree that Land Transport NZ's research programme adds value to the land transport industry | New |
≥80% |
81% |
| % of research projects completed on time | 70% |
≥75% |
49%1 |
| % of approved organisations and relevant transport industry representatives that agree that performance monitoring adds value to the land transport industry | New |
≥80% |
72% |
| % of approved organisations and land transport industry representatives that agree that Land Transport NZ's industry training adds value to the land transport industry | 81% |
≥80% |
72% |
Notes
1 A number of research projects had a target completion date of 30 June. Researchers have sought time extensions during the course of undertaking the research. These extensions have been approved with the resulting outcome in the performance measure that measures against the original completion date.
Actual |
Budget |
Actual |
|
|---|---|---|---|
7 months |
12 months |
12 months |
|
2004/05 |
2005/06 |
2005/06 |
|
| Research and performance monitoring | $000 |
$000 |
$000 |
| NLTP funding from NLTF | 2,707 |
4,953 |
4,953 |
| Total revenue | 2,707 |
4,953 |
4,953 |
| Expenditure | 2,707 |
4,953 |
5,563 |
| Output class net surplus (deficit) | 0 |
0 |
(610) |
Description
Under this output class, Land Transport NZ (or contracted agents) delivers transport safety information and promotion under the following outputs:
Output objectives
Progress towards a safer, more sustainable land transport system through effective and efficient:
| Performance measure | Actual 7 months |
Estimate |
Actual |
|---|---|---|---|
| Quantity | 2004/05 |
2005/06 |
2005/06 |
| Number of contracts for delivery of the Community Road Safety Programme (CRSP) | 37 |
150-180 |
181 |
| Number of schools participating in the Road Safety Education Programme | 1,115 |
1,000 |
1,257 |
| Number of issues of Land Transport News | 6 |
11 |
11 |
| Number of road codes reviewed and updated | 3 |
3 |
3 |
| Number of manuals and standards issued | 5 |
4 |
9 |
| Road safety data and issues reports | 0 |
74 |
74 |
| General land transport publications | 66 |
40 |
44 |
| National Community Road Safety Conference or Symposium | NA |
1 |
1 |
| Number of Australasian New Car Assessment Programme (ANCAP) advertising initiatives completed | 1 |
1 |
1 |
| Number of road safety advertising campaigns for Maori and Pacific peoples | 2 |
2 |
2 |
| Road Safety advertising package | |||
| > number of themed flights (flights) | 11.5 |
18 |
22 |
| > average number of targeted audience rating points (TARPs) purchased1 | 757 |
666 |
895 |
| % of media spend on television | 64% |
65%-75% |
67% |
Notes
1 This a monthly target. The monthly average was higher than the Statement of Intent target of 666 per month. The purchasing arrangements for
2005/06 enabled significantly more TARPS to be achieved within the available budget.
| Performance measure | Actual 7 months |
Target |
Actual |
|---|---|---|---|
| Quality | 2004/05 |
2005/06 |
2005/06 |
| % of Community Road Safety Programme providers who rate Land Transport NZ assistance and advice as very good or better based on independent surveys against agreed criteria | 82% |
≥75% |
73% |
| % of survey respondents who rate publications as useful or better | 81% |
≥75% |
80% |
| Total unprompted recall by the target audience of road safety television commercials, tested quarterly and averaged over 12 months | 73% |
≥70% |
77% |
| Relevance of road safety television commercials to the target audience, tested quarterly and averaged over 12 months | 56% |
≥60% |
63% |
Actual |
Budget |
Actual |
|
|---|---|---|---|
7 months |
12 months |
12 months |
|
2004/05 |
2005/06 |
2005/06 |
|
| Promotion, information and education activities | $000 |
$000 |
$000 |
| Safety administration programme (SAP) | 13,506 |
28,675 |
28,675 |
| Third party revenue | 2,546 |
2,871 |
4,011 |
| Total revenue | 16,052 |
31,546 |
32,686 |
| Expenditure | 21,846 |
31,601 |
32,976 |
| Output class net surplus (deficit) | (5,794) |
(55) |
(290) |
Description
This output class is directly delivered by Land Transport NZ (or contracted agents) to:
Output objectives
Progress towards a safer, more sustainable land transport system with reduced adverse impacts on the
environment and public health, through effective and efficient:
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| Number of rules signed | New |
5 |
15 (2 + 13 from Omnibus Rule)1 |
| Number of rules underway | New |
0 |
4 |
| Number of rules to be started | New |
7 |
3 |
| Reviews of vehicle inspectors and inspecting organisations |
1,622 |
1,800-2,200 |
2,307 |
| Audits of driver licence administration |
New |
30 |
30 |
| Audits of driver testing officers | 21 |
30 |
25 |
| Audits of driver licence course providers | 113 |
140-160 |
154 |
| Audits of licensed transport service operations | 77 |
100-120 |
112 |
| Audits of transport operator vehicle fleets | 30 |
40-50 |
75 |
| Random roadside audits of transport service vehicles | 50 |
20-40 |
24 |
| Reports on audits of border check agencies | 4 |
4 |
4 |
| Complaints investigated | 246 |
200 |
310 |
| Joint crash investigations | 19 |
15-21 |
23 |
| Road controlling authorities surveyed on 1-2 topics | 30 |
30 |
32 |
| Monitoring of rail operator's annual audits | 53 |
65-85 |
76 |
| Special focus rail audits | 1 |
0-4 |
1 |
| Number of Transport Accident Investigation Commission rail safety recommendations |
New |
0-2 |
0 |
| % Transport Accident Investigation Commission recommendations actioned and reported |
New |
100% |
100% |
| New safety management systems adopted by road controlling authorities |
16 |
5 |
5 |
| Safety management system implementation trials undertaken | 13 |
20 |
10 |
| Draft responses to ministerial correspondence | 182 |
300-400 |
345 |
| Draft responses to parliamentary questions | 49 |
90-120 |
67 |
| Direct responses to ministerial correspondence | 20 |
200-400 |
82 |
Notes
1 The draft Omnibus Rule was separated into 13 Amendment Rules (this had been counted as one in the target estimates).
2 Far fewer requests requiring direct responses to ministerial correspondence were received in 2005/06 than was estimated in the Statement of Intent targets.
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quality | |||
| % of safety-critical non-compliances rectified to the satisfaction of the Chief Executive within 30 days | New |
100% |
95% |
| % of driver tests that comply with the Land Transport NZ Driver testing officers manual (as determined by audit) | 99% |
95% |
100% |
| % draft responses to Ministerial correspondence and parliamentary questions accepted by the Minister | 98% |
≥95% |
96% |
| % Ministerial correspondence responded to within 12 working days | 100% |
100% |
71% |
| % parliamentary questions delivered within agreed timeframes | 100% |
100% |
100% |
| Regulatory implementation and enforcement | Actual 7 months 2004/05 $000 |
Budget 12 months 2005/06 $000 |
Actual 12 months 2005/06 $000 |
|---|---|---|---|
| Crown | 320 |
548 |
548 |
| Safety administration programme (SAP) | 995 |
1,335 |
1,335 |
| Contract services | 591 |
1,013 |
1,013 |
| Third party revenue | 10,477 |
15,503 |
19,476 |
| Total revenue | 12,383 |
18,399 |
22,372 |
| Expenditure | 13,757 |
19,636 |
20,439 |
| Output class net surplus (deficit) | (1,374) |
(1,237) |
1,933 |
Description
This output class is delivered directly by Land Transport NZ (using Crown and third party funding) to:
Output objectives
Progress towards a safer, more secure land transport system through effective and efficient delivery
of licensing activities.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| Driver licences issued (new, renewals, endorsements, overseas conversions and conversions/upgrades) | 395,305 |
700,000 |
565,000 |
| Transport services licences issued | 2,016 |
2,500-3,500 |
3,721 |
| Overdimension permits issued | 4,219 |
7,500-8,000 |
7,277 |
| Theory, practical and older driver tests | 219,931 |
410,000 |
375,000 |
| Number of vehicle impoundment payments | 1,480 |
4,800-5,000 |
2,735 |
| Number of drug and alcohol assessments | 514 |
1,400 |
967 |
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quality | |||
| Appeals on points of law or procedural matters sustained regarding the Chief Executive's decisions | Nil |
Nil |
Nil |
| % of licences issued within specified timeframes | 100% |
100% |
100% |
| % of ordinary and special over dimension permits issued within specified timeframes | 100% |
≥98% |
100% |
| % of driver tests delivered within timeliness guidelines | 95% |
≥95% |
96.9% |
| Licensing activities | Actual 7 months 2004/05 $000 |
Budget 12 months 2005/06 $000 |
Actual 12 months 2005/06 $000 |
|---|---|---|---|
| Crown | 965 |
1,655 |
1,655 |
| Safety administration programme (SAP) | 393 |
444 |
444 |
| Third party revenue | 25,317 |
45,910 |
42,771 |
| Total revenue | 26,675 |
48,009 |
44,870 |
| Expenditure | 26,156 |
47,939 |
43,268 |
| Output class net surplus (deficit) | 519 |
70 |
1,602 |
Description
This output class is delivered directly by Land Transport NZ (or contracted agents) to:
Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through effective and efficient management of the funding allocation system.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| Number of approved organisations audited | New |
29 |
40 |
| Number of activities subject to post-implementation audits | New |
9 |
12 |
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| Generally applied funding priority threshold (seriousness and urgency of the problem, effectiveness of the solution, efficiency of the solution) | New |
Medium Medium High |
Medium High |
| % of all activities that delivered the forecast benefits (as determined by post-implementation reviews/audits) | New |
100% |
83%1 |
| % of all activities delivered at forecast cost (as determined by post-implementation reviews/audits) | New |
100% |
75%2 |
| % of relevant stakeholders who rate the way in which Land Transport NZ assists and advises stakeholders to formulate proposed activities and procurement procedures as 'very good' or better based on independent surveys against agreed criteria | New |
>75% |
59%3 |
| % of relevant stakeholders who rate the way in which Land Transport NZ processes and administers funding applications and procurement procedures as 'very good' or better based on independent surveys against agreed criteria | New |
>75% |
60%3 |
| % of relevant stakeholders who rate the way in which Land Transport NZ undertakes its auditing activities as 'very good' or better based on independent surveys against agreed criteria | New |
>75% |
78%3 |
Notes
1 Two out of 12 projects had high negative safety benefits from turning movements at intersections.
2 Three projects out of 12 cost more than the forecast cost. Two projects were well under.
3 The Statement of Intent targets were set with the understanding that 'very good' was the second to best rating. However, in the survey 'very good' was the top rating. To keep the scores for these measures relevant and meaningful, they have been reported against 'good or better'.
| Performance measure continued | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quality continued | |||
| % of issues raised in audits of approved organisations that are resolved within agreed time-frames | 100% |
100% |
66%4 |
| Publication of the NLTP for the following financial year no later than 30 June | Yes |
Yes |
Yes |
| % of agreements with approved organisations that are in place by 31 July | New |
100% |
72% |
| Efficiency of new works in the NLTP as measured by benefit/cost ratio (average for applicable approved activities) | New |
>2 |
3.6 |
| Land Transport NZ costs for management of the funding allocation system as a % of the total cost of the National Land Transport Programme | New |
<1% |
0.8% |
| Management of the funding allocation system | Actual 7 months 2004/05 $000 |
Budget 12 months 2005/06 $000 |
Actual 12 months 2005/06 $000 |
|---|---|---|---|
| NLTP funding from NLTF | 5,198 |
13,287 |
13,287 |
| Total revenue | 5,198 |
13,287 |
13,287 |
| Expenditure | 5,198 |
13,287 |
12,078 |
| Output class net surplus (deficit) | 0 |
0 |
1,209 |
Notes
4 Recommendations not taken up relate to the Road Assessment Maintenance and Management system (RAMM) and technical reviews which can take longer than 12 months to resolve.
Description
Under this output class, Land Transport NZ is contracted to provide the following services under an agreement with the Secretary for Transport:
Output objectives
Improved planning, maintenance, management and development of the land transport system through effective and efficient management of the motor vehicle registry and revenue collection.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| Collection and refund of revenue > Motor vehicle new registration > Motor vehicle licences > Motor vehicle change of ownership > Other licensing transactions > Road user charge licences > Road user charge refunds > Fuel excise duty refunds |
190,112 2,950,297 573,171 396,172 1,170,841 172,999 11,752 |
340,000 5,300,000 1,050,000 870,000 2,000,000 290,000 14,000 |
327,000 5,080,000 1,002,000 1,290,000 1,962,000 310,000 25,000 |
| Motor vehicle information > Number of motor vehicle information requests |
4.4m |
10.0m |
10.9m |
| Evasion detection and enforcement > Number of road user charge investigations > Number of road user charge audits > Number of road user charge surveys > Number of light vehicle audits |
76 1,523 26 8,713 |
90-110 3,000-4,500 60-80 10,000-12,000 |
109 2,806 82 15,161 |
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quality | |||
| Collection and refund of revenue | |||
| > Unplanned outage of LANDATA1 computer system | 0.36hrs |
<48hrs |
3.5hrs |
| > Accuracy of LANDATA computer system records (by random sample) | 98% |
≥95% |
97.9% |
| > % of motor vehicle registry and road user charge licence customers who rate the services provided as 'good' or better based on independent survey | 97% |
≥90% |
96% |
| > Road user charge and motor vehicle registry total costs per transaction | $5.86 |
$6.11 |
$5.83 |
| Motor vehicle information | |||
| > % of users who rank motor vehicle registry supplied data as meeting their expectations, based on independent survey | 83% |
≥90% |
86% |
| Evasion detection and enforcement | |||
| > Amount of identified and proven road user charge revenue evasion | $7.3m |
$8-10m |
$12.78m |
| > Amount of revenue recovered from road user charge evasion | New |
0 |
NA2 |
| > Amount of revenue from road user charge and motor vehicle registry evasion written off as bad debt | New |
0 |
NA2 |
| Motor vehicle registry and revenue management | Actual 7 months 2004/05 $000 |
Budget 12 months 2005/06 $000 |
Actual 12 months 2005/06 $000 |
|---|---|---|---|
| Contract services | 23,677 |
48,886 |
45,886 |
| Third party revenue | 6,866 |
12,267 |
12,135 |
| Total revenue | 30,543 |
61,153 |
58,021 |
| Expenditure | 32,323 |
60,852 |
56,535 |
| Output class net surplus (deficit) | (1,780) |
301 |
1,486 |
Notes
1 LANDATA is the register for motor vehicles, road user charges and the vehicle inspection system.
2 New measures put in place for 2005/06 but the process was not put in place to measure the performance of set targets. The process has been
put in place for 2006/07 year.
Description
Under this output class, Land Transport NZ co-funds, with approved organisations, initiatives that encourage the
movement of freight by rail and coastal shipping (including barging) instead of by road.
Output objectives
Progress towards a safer, more integrated and sustainable land transport system though effective and efficient
use of alternatives to road freight.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| Freight diverted from road to rail (million tonne-km) | New |
22.0 |
Nil1 |
| Freight diverted from road to coastal shipping (million tonne-km) | New |
8.4 |
5.6 |
| Number of currently funded activities | New |
5 |
6 |
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quality | |||
| % of allocated funds actually spent | New |
100% |
18%2 |
| Forecast efficiency ratio (average for approved new activities) | New |
>1 |
Nil |
| % of activities that delivered the forecast benefits (as determined by post-implementation reviews/audits) | New |
100% |
NA3 |
| Total cost ($000) | New |
2,065 |
371 |
Notes
1 No new funding applications were received.
2 Regions are still developing their priorities for funding, hence there have been very few projects developed sufficiently to enable funding applications to be made.
3 No activities reviewed this year.
Description
Under this output class, Land Transport NZ co-funds, with approved organisations:
Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through
effective and efficient activities that:
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| Number of school travel plans funded | New |
100 |
551 |
| Number of workplace travel plans funded | New |
40 |
411 |
| Length of walkway/cycleway funded (km) | New |
100 |
36.71 |
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quality | |||
| % of allocated funds actually spent | New |
100% |
47%2 |
| Forecast benefit/cost ratio (average for approved new activities) | New |
>1 |
2.1 |
| % of activities that delivered the forecast benefits (as determined by post-implementation reviews/audits) | New |
100% |
NA3 |
| Total cost ($000) | New |
17,607 |
8,216 |
Notes
1 The target was new for 2005/06 and was set in the absence of historical information and detailed information from approved organisations on their funding applications.
2 Regions are still developing their priorities for funding, hence few projects have been sufficiently developed to enable funding applications to be made.
3 No activities reviewed this year.
Description
Under this output class, Land Transport NZ co-funds non-commercial road, rail and ferry infrastructure and services delivered by approved organisations.
Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through effective and efficient activities that increase access to and use of passenger transport services.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| Total boardings on buses (million) | No return |
92.0 |
89.91 |
| Total boardings on ferries (million) | No return |
4.0 |
4.2 |
| Total boardings on rail (million) | No return |
15.0 |
16.32 |
| Total mobility boardings (million) | No return |
1.9 |
1.9 |
| Total passenger-km on buses (million) | New |
650.0 |
620.5 |
| Total passenger-km on ferries (million) | New |
39.0 |
47.7 |
| Total passenger-km on rail (million) | New |
330.0 |
352.0 |
| Length of dedicated bus-lane funded (km) | New |
4.0 |
16.03 |
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| User satisfaction, as measured by the % of users who rate passenger transport services as 'good' or better by an annual independent survey | No return |
≥75% |
88%2 |
| User satisfaction, as measured by the % of users who rate total mobility services as 'good' or better by an annual independent survey | No return |
≥75% |
90% |
| Land Transport NZ subsidy per passenger boarding on buses | New |
$0.90 |
$1.05 |
| Land Transport NZ subsidy per passenger boarding on ferries | New |
$0.39 |
$1.554 |
| Land Transport NZ subsidy per passenger boarding on rail | New |
$2.73 |
$2.02 |
| Land Transport NZ subsidy per passenger-km | No return |
$0.12 |
$0.135 |
| % of total costs recovered by fares on non-commercial services | No return |
45.7%6 |
|
| Forecast benefit / cost ratio (average for approved new activities) | New |
>1 |
1.4 |
| % of activities that delivered the forecast benefits (as determined by post-implementation reviews/audits) | New |
100% |
NA7 |
| Total cost ($000) | 65,069 |
181,581 |
211,789 |
Notes
1 Boardings were 5% higher (4.2 million) than 2004/05. Bus patronage was lower than target, primarily due to lower growth rates than originally predicted.
2 Actual rail patronage was 14.7% higher than 2004/05 and higher than target due to growth in passenger rail in Auckland.
3 Predominantly Northern busway.
4 New performance measure, the initial target took account of commercial as well as contracted passenger boardings. A revision will be required for 2006/07.
5 The higher subsidy per total passenger kilometre is primarily due to cost escalation of service provision outweighing the increase in overall passenger kilometres.
6 The lower farebox recovery reflects a greater contribution of the additional costs being met by subsidy payments. Regional fare increases in 2006/07 should go some way to keep this from dropping further.
7 No activities reviewed this year.
Description
Under this output class, Land Transport NZ funds regional priority land transport activities and the improvement of roads for the regional development of Northland and Tairawhiti. These outputs are delivered by approved organisations (with Land Transport NZ funding support).
Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system in each region by contributing effectively and efficiently towards:
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| % of funds allocated to output classes: | New |
||
| > Transport demand management, walking and cycling | 10% |
4% |
|
| > Passenger transport services | 26% |
40% |
|
| > New and improved state highways | 48% |
Nil1 |
|
| > New and improved local roads | 16% |
56% |
|
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| % of allocated funds actually spent | New |
100% |
9%2 |
| Note: Specifics of performance reported within other output classes | |||
| Total cost ($000) | 17,529 |
65,563 |
6,104 |
Notes
1 No funding requests received for state highways.
2 Most regions are still developing their priorities for funding, hence very few projects were sufficiently developed to enable funding applications to be made.
Output objectives
Progress towards a more responsive land transport system by assisting regional economic development through effective and efficient improvements to land transport infrastructure.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| % of funds allocated to: | New |
||
| > new and improved state highways | 0% |
Nil |
|
| > new and improved local roads | 100% |
100% |
|
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| % of allocated funds actually spent ($15m allocated) | New |
100% |
101%2 |
| Note: Specifics of performance reported within other output classes |
Description
Under this output class, the Minister of Transport purchases activities that support the increased integration of transport and land use in the Auckland region, using Crown funding. This output is delivered by approved organisations (with Land Transport NZ funding support).
Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system in Auckland, through effective and efficient activities, with priority given to:
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| % of funds allocated to output classes: | New |
||
| > Passenger transport services | 100% |
100% |
|
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| % of allocated funds actually spent | New |
100% |
8%1 |
| Note: Specifics of performance reported within other output classes | |||
| Total cost ($000) | New |
64,000 |
4,947 |
Notes
1 The Auckland region is still developing their priorities for funding. Therefore, very few projects have been sufficiently developed to enable
funding applications to be made.
Description
Under this output class, the Minister of Transport purchases activities that retain passenger transport mode share, address congestion and improve access to the Wellington region, using Crown funding. This output class is delivered by approved organisations (with Land Transport NZ funding support).
Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system in Wellington, though effective and efficient activities, with priority given to:
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| % of funds allocated to output classes: | New |
||
| > Transport demand management, walking and cycling | 13 |
100%1 |
|
| > Passenger transport services | 42 |
Nil |
|
| > New and improved state highways | 30 |
Nil |
|
| > New and improved local roads | 15 |
Nil |
|
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| % of allocated funds actually spent | New |
100% |
7%2 |
| Note: Specifics of performance reported within other output classes | |||
| Total cost ($000) | New |
1,250 |
93 |
Notes
1 No funding applications were received for passenger transport services, new and improved state highways or new and improved local roads. 100% of funds allocated were to transport demand management, walking and cycling.
2 The Wellington region is still developing their priorities for funding, hence there have been very few projects sufficiently developed to enable funding applications to be made.
Description
Under this capital appropriation Land Transport NZ purchases state highway capital improvements. This output class is delivered by approved organisations (with Land Transport NZ funding support).
Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through effective and efficient development of new and improved road infrastructure.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| New roads (lane-km) | New |
6 |
3.61 |
| New bridges (lane-m) | New |
20 |
N/A2 |
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| Cost of new urban roads ($/m2 of new road) | New |
$2800/m2 to $4000/m2 |
|
| Cost of new rural roads ($/m2 of new road) | New |
$200/m2 to $500m2 |
|
| Forecast benefit/cost ratio (average for approved new activities) | New |
≥4 |
4.0 |
| % of activities that delivered the forecast benefits (as determined by post-implementation reviews/audits) |
New |
100% |
67%3 |
| Total cost ($000) | 679,559 |
714,470 |
|
| Less cost funded by Transit New Zealand property sales | (15,000) |
(12,423) |
|
| Total cost funded by NLTP ($000) | 293,819 |
664,559 |
702,047 |
Notes
1 Includes new infrastructure for roads.
2 New bridges are no longer separately accounted for. They are now included in new roads.
3 Four out of six projects reviewed delivered the forecast benefits.
Description
Under this output class, Land Transport NZ purchases the routine and periodic maintenance of state highways.
Output objectives
Progress towards a safer, more sustainable land transport system through effective and efficient preservation of roading infrastructure.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| Minor safety activities ($000) | New |
26,133 |
21,298 |
| Road reconstruction (lane-km) | New |
40 |
82 |
| Pavement smoothing (lane-km) | New |
60 |
7 |
| Area wide pavement treatment (lane-km) | New |
360 |
170 |
| Reseals (lane-km) | New |
2,600 |
1,185 |
| Bridge reconstruction (lane-m) | New |
1,000 |
2,900 |
| % of roads undergoing periodic maintenance | New |
13% |
|
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| Ride quality (smooth travel exposure, STE) | New |
Steady |
Steady |
| Road condition index (CI) | New |
Improving1 |
|
| Road pavement integrity index (PII) | New |
Improving1 |
|
| Cost of routine maintenance per network-km | New |
$19.4 |
|
| Cost of periodic maintenance per network-km | New |
$13.6 |
|
| Total cost | 186,570 |
227,166 |
|
| Less cost funded by Transit New Zealand property sales | (12,100) |
(18,131) |
|
| Total cost funded by NLTP ($000) | 243,155 |
174,470 |
209,035 |
Notes
1 Reflects trend over last five years.
Description
Under this output class, Land Transport NZ co-funds, with approved organisations, local roads capital improvements.
Output objectives
Progress towards a safer, more integrated, responsive and sustainable land transport system through effective and efficient development of new and improved road infrastructure.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| New roads (lane-km) | New |
8 |
1441 |
| Seal extensions (lane-km) New 280 209 | New |
280 |
209 |
| New bridges (lane-m) | New |
40 |
4131 |
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| Cost of new urban roads ($/m2 of new road) | New |
$40 to $265 |
|
| Cost of new rural roads ($/m2 of new road) | New |
$20 to $175 |
|
| Forecast benefit / cost ratio (average for approved new activities) | New |
≥4 |
4.2 |
| % of activities that delivered the forecast benefits (as determined by post-implementation reviews/audits) | New |
100% |
100% |
| Total cost ($000) | 84,503 |
312,410 |
281,012 |
Notes
1 Target erroneously based on recent past achievement instead of projects submitted for 2005/06. Actual based on information provided through the Annual Achievement Returns collected from approved organisations.
Description
Under this output class, Land Transport NZ co-funds, with approved organisations, the routine and periodic maintenance of local roads infrastructure.
Output objectives
Progress towards a safer, more sustainable land transport system through effective and efficient preservation of roading infrastructure.
| Performance measure | Actual 7 months 2004/05 |
Estimate 2005/06 |
Actual 2005/06 |
|---|---|---|---|
| Quantity | |||
| Minor safety activities ($000) | New |
26,708 |
25,814 |
| Road reconstruction (lane-km) | New |
360 |
282 |
| Pavement smoothing (lane-km) | New |
200 |
282 |
| Area wide pavement treatment (lane-km) | New |
900 |
704 |
| Reseals (lane-km) | New |
7,600 |
5,447 |
| Bridge reconstruction (lane-m) |
New |
1,400 |
492 |
| % of roads undergoing periodic maintenance | New |
9% |
8% |
| Performance measure | Actual 7 months 2004/05 |
Target 2005/06 |
Actual 2005/06 |
| Quality | |||
| Ride quality (smooth travel exposure, STE) | New |
Steady |
Steady |
| Road condition index (CI) | New |
Improving |
Improving1 |
| Road pavement integrity index (PII) | New |
Steady |
Improving1 |
| Cost of routine maintenance per network-km | New |
$2.6 |
|
| Cost of periodic maintenance per network-km New $1.8 | New |
$1.8 |
|
| Total cost ($000) | 239,335 |
167,715 |
225,401 |
Actual 7 months 2004/05 |
Budget 12 months 2005/06 |
Actual 12 months 2005/06 |
|
|---|---|---|---|
| National Land Transport Programme | $000 |
$000 |
$000 |
| Crown | 48,301 |
60,498 |
61,054 |
| NLTP funding from NLTF | 783,739 |
1,462,827 |
1,462,114 |
| Third party revenue | 7,446 |
2,000 |
14,222 |
| Total revenue | 839,486 |
1,525,325 |
1,537,390 |
| Expenditure | 956,055 |
1,651,220 |
1,649,015 |
| Output class net surplus (deficit) | (116,569) |
(125,895) |
(111,625) |
Notes
1 Reflects trend over the last five years.
Page created: 13 February 2007