Land Transport NZ is now
part of the NZ Transport Agency
www.nzta.govt.nz
Accessibility | Help | Site index | Contact us
Part 9: Level crossings
Last updated: December 2008. This document ceases to be a controlled document when printed. Please refer to the current version at www.landtransport.govt.nz
The rail access provider is responsible for the formation and maintenance of the road surface 5 m either side from the centreline of the railway line.
Where ONTRACK is the rail access provider, it will also construct or reconstruct level crossings in accordance with its standards. Other rail access providers may have specific requirements.
The road controlling authority is responsible for the formation and maintenance of the road surface beyond 5 m and all associated pavement marking related to the level crossing regardless of the 5 m distance.